Guidelines

RAIL TRAFFIC: regardless of the construction methodology you choose, this bridge must be “buildable” with NO disruption of rail service.

BRIDGE DESIGN: for the purposes of this charette, your bridge design should be “buildable” for $10 million or less.

i) Type: cable-stayed, suspension, arch, girder, hybrid or even an inspired version of the box truss. It’s up to you as long as it can be built within the budget with no disruption of rail service. Your design can be clear span or you can take advantage of the proposed supporting pier in the existing plans. End users are pedestrians and cyclists

ii) Special requirements: the bridge deck must be partially or completely enclosed (glazing, screens etc.) to prevent access to the rail corridor.

iii) Key Opportunity - On-site assembly: on the south side of the corridor, just west of the proposed location is a vacant parcel of land more than 175 metres wide (future site housing site).

SUBMIT A DESIGN

REQUIRED SUBMISSION ELEMENTS
Submissions received will be posted by charette moderators in the charette section of UrbanToronto.ca.

i) TEXT - please supply a brief narrative (250 words or less) describing your design and any key construction strategies (modular, cantilevered etc.).

ii) IMAGES* - please submit 1 to 5 jpeg images of your design at screen resolution (72 dpi). Moderators reserve the right to resize any jpegs before they are posted. If possible, please retain high resolution (300 dpi) copies of your images for possible publication in print media.

Please ensure that one of the images submitted includes your bridge design “in place” in the aerial photo provided in the RESOURCES section. A variety of other photos of the rail corridor location may downloaded from the RESOURCE section and used for your submission. Any other photos used must belong to you, be rights free or used with permission. When your submission is ready, click here to submit by email: