Guidelines
RAIL
TRAFFIC: regardless of the construction methodology you
choose, this bridge must
be “buildable” with
NO disruption of rail service.
BRIDGE
DESIGN: for the purposes of this charette, your bridge
design should be “buildable” for
$10 million or less.
i)
Type: cable-stayed, suspension, arch, girder, hybrid or
even an inspired version of the box truss. It’s up
to you as long as it can be built within the budget with
no disruption of rail service. Your design can be clear
span or you can take
advantage
of the proposed supporting pier in the existing plans.
End users
are pedestrians and cyclists
ii) Special requirements: the bridge deck must be partially
or completely enclosed (glazing, screens etc.) to prevent
access to the rail corridor.
iii)
Key Opportunity - On-site assembly: on the south side of
the corridor, just west
of the proposed location
is
a vacant parcel of land more than 175 metres wide (future
site
housing site).
|
SUBMIT
A DESIGN
REQUIRED
SUBMISSION ELEMENTS
Submissions
received will be posted by charette moderators in the charette
section of UrbanToronto.ca.
i)
TEXT - please supply a brief narrative (250 words or less)
describing your design and
any key construction strategies
(modular, cantilevered etc.).
ii)
IMAGES* - please submit 1 to 5 jpeg images of your design
at screen resolution
(72 dpi). Moderators reserve
the right
to resize any jpegs before they are posted. If possible,
please retain high resolution (300 dpi) copies of your
images for possible publication in print media.
Please
ensure that one of the images submitted includes your
bridge design “in place” in
the aerial photo provided in the RESOURCES section.
A variety of other photos of the rail corridor location
may downloaded from
the RESOURCE
section and used for your submission. Any other photos
used must belong to you, be rights free or used with
permission. When your submission is ready, click
here to
submit by
email:

|